Kompan is the Australian division of a Scandinavian company that designs and manufacture very large playground environments, generally for urban spaces and predominantly clients such as schools and local councils.

We have had a business relationship with Kompan going back nearly 15 years and had already relocated them twice before. In this case, they had simply outgrown their previous facility in northern Brisbane and found another building nearby that was probably twice the size.

Location: Brisbane QLD Australia

R

Customised Racking

Racking & Shelving Solutions

R

Racking Audits

For Compliance & Efficiency

R

Budget-Friendly

Second-Hand Pallet Racking

Designing Storage Around Large Playground Equipment

Kompan is the Australian division of a Scandinavian company that designs and manufacture very large playground environments, generally for urban spaces and predominantly clients such as schools and local councils.

The equipment comes in from overseas manufacturers and can be exceptionally large. We are talking six-metre-plus boxes and various containerised goods that need to be received, stored and held until Kompan receive the go-ahead to install the playground equipment wherever that particular project might be.

We have had a business relationship with Kompan going back nearly 15 years and had already relocated them twice before. In this case, they had simply outgrown their previous facility in northern Brisbane and found another building nearby that was probably twice the size.

The project involved relocating most of their existing cantilever racking and some pallet racking into the new building, providing additional pallet racking where required, installing barrier and protection systems and then working with both Kompan and the building certifier to get the racking approved and ready for installation.

A Building That Changed How They Could Handle Incoming Stock

The new facility was basically a very large box, around 5,000m2 and what made it particularly useful for Kompan was the working area outside the warehouse. They had a massive forecourt with the ability to receive potentially five or six shipping containers, which was a real game changer for them.

There was also a very large awning, which meant those containers could be unloaded in any weather. Stock could then be apportioned into the individual projects it was intended for rather than trying to manage everything within a much smaller receiving area.

The cantilever racking was relocated and reconfigured around the goal of improving their stock receiving and project management. 

Inside the warehouse, we really had two key areas to consider. There was the main warehouse itself, which was a very large open space, and then to the left there was a warehouse office area with an upstairs office area.

Part of the brief was to create a barrier system that allowed the warehouse operation to continue while effectively screening pedestrians, general workers and visitors from forklifts and stored goods.

There were also four very large structural support columns within the warehouse. Those had to be incorporated into either the cantilever racking layout or the barrier system so they were protected from forklift impact.

We are generally very reluctant to leave building columns unprotected without racking either in front or behind them or alternatively with a barrier systems to mitigate the potential for forklift impact.

There are some very interesting stories around what it costs to repair a structural building column after a forklift has hit it, and we can only say, its not easy or cheap repair process.

Designing Around Long and Unpredictable Stock

One of the challenges Kompan has always faced is that when a shipping container arrives and they open the doors, they do not necessarily know exactly how the items inside have been packed.

They may know what is coming, but the actual size of the boxes and crates and how those items relate to the available storage space can vary considerably.

That is why mesh decking has become such an important part of their cantilever racking.

The Kompan cantilever has large runs of mesh decking over the arms, which means a wide variety of boxes and crates can be placed onto it without having to worry about whether there is sufficient support underneath the packaging.

Without that support, there is the potential for the box or crate itself to collapse and damage the product inside.

It was not a new idea for this warehouse as we had developed that solution with Kompan previously.  It worked so well that they wanted to continue and expand it in the new warehouse.

There is still another stage planned involving additional cantilever racking, and some of that will also have mesh decking.

The selective pallet racking uses mesh decks for a similar reason.

Some of the oversea stock comes in on Euro pallets, and again, as they cannot always predict exactly how products will arrive, the mesh decking gives them the ability to safely receive and store those pallets without having to redesign the storage arrangement every time something slightly different turns up.

Giving Them Room to Handle Even Larger Products

The aisle widths were another important part of the design.  With sufficient early planning, we were able to access the CAD file for the building and we could integrate the building structure into the layout of both the cantilever and pallet racking.

That meant positioning the cantilever either in front of or behind the structural columns, effectively protecting those columns while still providing the aisle and space clearances Kompan required. We worked with Kompan’s warehouse team  to make sure the aisle spaces were at least as large as what they had at the previous site and, in some areas, slightly wider.

Kompan were anticipating that even larger items could eventually arrive, so we needed to design for that possibility rather than simply replicate what they had before.

There is no benefit in squeezing another run of racking into a warehouse if you create an aisle that the warehouse team cannot practically use.

Workshop and Assembly Space Was Part of the Storage Plan

Not every part of the Kompan facility needed to be filled with racking. Some open areas were retained for workshop use and partial assembly. Most of the equipment arrives in something of a flat-pack form, and Kompan may partially assemble components before they go out to site.

It really comes back to the size of a particular item and whether it can be transported safely on a truck once assembled.   Where they can do some of that assembly work in the warehouse, it can eliminate time spent at the final installation site.

That is part of warehouse planning as well. It is not simply a question of asking how many racks can fit inside the building. You need to understand what the business actually does between receiving the product and sending it back out again.

Reusing Racking That Had Already Been in Service for More Than a Decade

Some of Kompan’s cantilever racking had already been in service for 10 to 12 years. During this time, it was regularly inspected and exceptionally well maintained.

Because we were relocating and transporting the existing racking, part of the project involved carrying out any necessary repairs and maintenance along the way and making sure the equipment remained in good condition and capable of meeting the relevant requirements for cantilever racking.

Some of the pallet racking was also relocated from the previous facility, with additional racking supplied to accommodate their increased pallet storage requirement.

Where possible, we configured the additional storage in a similar way to what they already had.

There is a practical benefit to that. The staff already know the system, they are comfortable working with it and you are not unnecessarily changing something that has worked well for the business.

Warehouse Relocations and General Consent Requirements

Probably the biggest lesson from this project had very little to do with the actual racking.

Kompan was moving into a new building that was one of four very large units within the same complex. The other three units were already occupied.

The question had been asked early on about what building approvals or general consent requirements were required for the racking in the new building, but the lease had actually been signed before that clarification came through. So, there was still some work to do around the building/storage racking approval process.

We then worked with Kompan and the certifier to make sure the racking met the relevant requirements for the building approval.

It is something we see quite regularly when companies relocate. Everyone is concentrating on whether the building itself is right for the business. They’re looking at the floor area, rent, access, location and whether they can physically fit everything inside.

Any statutory approvals relating to the racking is one of those things that often get forgotten about until the Certifier starts asking questions such as 

  1. Is the racking compliant with the relevant standards
  2. How was the relocated racking assessed? 
  3. When was it last inspected? 
  4. Is it suitable for the new configuration? 
  5. What documentation is available?

In this case, we were able to work through those questions with the Certifier and make sure the relevant information was available so the racking could be approved for the new facility.

If there is one thing we would encourage for any company contemplating a warehouse relocation to do, start your planning early and get all the issues out on the table.

Work through the storage design in terms of what you need at the new site, determine if you current racking will meet your needs and find out exactly what the building and certification requirements are.  Make sure the information is available before it becomes critical.

And don’t assume you have sufficient time. It always seems to turn out that you have only just enough.

Have A Question?

Looking for the right racking solution for your warehouse? Whether you’re unsure which system suits your stock, need help with custom sizing, or just want expert advice, we’re here to help.

Frequently Asked Questions

How long will it take to install my new storage system?

The time it takes to install your new storage system will depend on the size and complexity of the system. Larger, more complex systems such as racking may take longer to install; however, your storage specialist can give you an estimated time frame for your specific system.

Should I opt for racking or shelving for my business?

It really depends on what you’re storing and how often you need to access it. If you have heavy or awkwardly-shaped items, racking might be a better option. If you need to access your stored items frequently, shelving might be a better choice.

Do I need a pallet racking audit?

A pallet racking audit is a good idea if you’re considering installing or upgrading your pallet racking system. The audit will assess your current system and make recommendations for improvements. It’s a good way to ensure that your pallet racking is safe and fit for purpose.

Limited on Space?

Running out of space in your warehouse or office and wondering what you could do to avoid a costly relocation? We can help you go up rather than out and take advantage of your vertical space. Ask our team about Raised Storage Areas and Mezzanine Floors today.

Thank you and your team for such an easy install today. Quality work & appreciate your guys taking the time to talk through options while installing. Highly recommend

Blair Cosford - Google Review

Menno and the team were excellent in helping us set up a new warehouse. Very quick turn around great price and excellent with dealing with any issue.

Peter Lewis - Google Review

Send A Message

Request your FREE layout plan

Whether you’re fitting out a new space or upgrading an existing one, maximise your warehouse space and streamline your operations with a customised racking layout, designed by the experts.